Final Rough Clean
Removal of remaining loose construction-related dirt before detailed cleaning begins.
- Loose dirt and dust
- Agreed packaging or material remnants
- Preparation for final detailing
Bokma Dienstleistungen GmbH provides post construction cleaning in Nuremberg after new-build, renovation, refurbishment, fit-out and conversion work. We remove agreed construction-related dust, loose dirt, labels, protective film and other suitable residues and prepare the property for inspection, handover, occupancy or the next stage of use.
Post construction cleaning is the detailed cleaning carried out after building, renovation or refurbishment work is substantially complete. It focuses on construction dust and agreed residues from finished surfaces so the property can be inspected, handed over, furnished or occupied. It is more detailed than a basic site clean-up and is usually planned room by room and surface by surface.
After new construction, renovation, conversion, fit-out or refurbishment and before inspection, handover or occupancy.
Agreed floors, surfaces, doors, sanitary areas, glass and suitable construction-related residues depending on the specification.
By property size, condition, amount of fine dust, residue type, surfaces, glass, access, deadline and required level of finish.
“Post construction cleaning” can mean different levels of cleaning. The most important step is to define whether the property only needs remaining construction dirt removed or a more detailed final clean before handover or occupancy.
Removal of remaining loose construction-related dirt before detailed cleaning begins.
Detailed cleaning of agreed finished surfaces after most trade work has been completed.
Final cleaning aligned with the agreed condition required before inspection, handover or move-in.
The exact scope is agreed before work starts. Surface compatibility matters: not every construction residue can be treated in the same way on glass, stone, metal, wood, coatings or other finished materials.
Detailed dust removal from agreed accessible finished surfaces after construction and renovation work.
Cleaning of suitable floors, doors, skirting, window sills and other agreed completed surfaces.
Suitable window and glass cleaning can be included when required for the final handover condition.
Removal of suitable labels, stickers and protective films where included and technically appropriate.
Final cleaning of agreed bathroom, washroom and sanitary surfaces after installation work is complete.
Cleaning of accessible newly installed or refurbished surfaces according to the agreed scope.
Post-renovation cleaning for entrances, stairwells, landings and shared property areas.
Where older dirt exists alongside construction dust, additional intensive cleaning can be assessed separately.
The terms overlap, but the timing is different. Construction cleaning can happen throughout the building process. Post construction cleaning specifically focuses on the period after the main work is substantially complete.
| Service | When | Main purpose | Typical result |
|---|---|---|---|
| Construction Cleaning | During and after building work | Support the construction process and remove building-related dirt | Cleaner working areas or preparation for the next trade |
| Post Construction Cleaning | After the main work is substantially complete | Remove fine dust and agreed residues from completed surfaces | Property ready for inspection, handover or furnishing |
| Handover Cleaning | Immediately before inspection or transfer | Meet a clearly agreed final presentation standard | Clean final condition within the specified scope |
| Deep Cleaning | Independent of construction timing | Intensive treatment of general or older dirt | Periodic or one-off intensive clean |
We plan the cleaning around the finished surfaces, project size and handover requirements of the actual property.
Final cleaning after new-build or major renovation before furnishing, occupancy or owner handover.
Cleaning after office fit-out, refurbishment or conversion before employees return or a tenant moves in.
Detailed cleaning after construction or shopfitting work in commercial and customer-facing premises.
Post-refurbishment cleaning of agreed rooms and surfaces before normal operation resumes.
Cleaning after modernization work in shared areas, entrances, staircases or renovated units.
Final cleaning after painting, flooring, drywall, installation or broader refurbishment projects.
Good final cleaning starts with a clear picture of the construction status and the required handover condition.
Provide the address, approximate area, photos, construction status and preferred cleaning or handover date.
For larger or more complex properties, we assess surfaces, access, residue types and remaining trade work on site.
Rooms, surfaces, glass, labels, sanitary areas and exclusions are listed so everyone knows what is included.
The cleaning date is aligned with completion of dusty trades, installation work and the planned inspection or handover.
The agreed areas are cleaned and checked against the defined final scope before completion.
A realistic quote depends on more than square metres. Fine dust, adhesive residue, glass, surface sensitivity and the required handover condition can change the workload significantly.
The biggest problem in post construction cleaning is often not the cleaning itself but unclear expectations. Bokma defines the areas, surfaces, timing and desired final condition before the job starts.
Bokma Dienstleistungen GmbH has been serving clients from its Nuremberg base since 2016 and provides cleaning services for commercial and private properties.
German-language construction cleaning page for rough, intermediate, fine and final cleaning.
Learn more →Additional intensive cleaning where older or heavier dirt is present.
Learn more →Professional window and glass cleaning where included in the final scope.
Learn more →Ongoing cleaning once construction work is finished and the property is in use.
Learn more →Bokma Dienstleistungen GmbH is based at Hermann-Kolb-Str. 35b, 90475 Nuremberg. We provide post construction and final cleaning for properties in Nuremberg and, depending on the project, also in Fürth, Erlangen, Schwabach and other parts of the metropolitan region.
Depending on the agreed scope, it can include fine construction dust removal, suitable floors and finished surfaces, sanitary areas, windows and glass, labels, protective film and other agreed construction-related residues.
Construction cleaning can take place throughout a building project. Post construction cleaning is specifically carried out after the main construction or renovation work is substantially complete and focuses on the final condition before handover or occupancy.
Yes. Post-renovation cleaning for apartments and houses can be requested, including suitable floors, surfaces, sanitary areas and windows where agreed.
Suitable windows, glass and frames can be included. The exact method depends on the surface and the type of construction residue present.
Pricing depends on property size, level of fine dust, remaining residues, surfaces, glass areas, access, deadline and the required handover condition. Bokma provides an individual quote.
Ideally after major dusty trades are complete and before furniture installation, tenant move-in or final handover. The exact timing should be coordinated with the remaining construction schedule.
Yes. A handover cleaning can be planned around a clearly defined final condition and the scheduled inspection or transfer date.
The main service area is Nuremberg. Depending on project size and schedule, work can also be arranged in Fürth, Erlangen, Schwabach and other nearby locations.
Send us the property size, current construction status, photos and your required handover or cleaning date. We will review the scope and prepare an individual, non-binding quote.
Hermann-Kolb-Str. 35b · 90475 Nuremberg · Germany